FCU
Fan Coil Unit cleaning, motor care, drain service, valve checks and repair support.
What the Property Shows
Inspection follows the complete system path before any work is proposed.
Squealing or vibration from ceiling units.
Drain pan overflow or rust.
Valve actuator not responding to controls.
Inside the System
FCUs transfer cooling from chilled water or refrigerant into room air, so coils, fans, valves and drains must stay clean and serviceable.
Request an inspection ↗Inspection Sequence
Site Survey
Inspect the FCU layout, equipment access, power, drainage, airflow path and operating condition.
Technical Scope
Define the correct installation, cleaning or maintenance method for the FCU before execution begins.
Execution
Carry out the approved work with property protection, calibrated tools and clean mechanical workmanship.
Testing & Handover
Verify airflow, temperature, pressure, noise and safe operation after the FCU work is complete.
Target Performance
Restored room cooling.
VERIFIED TARGETLower leak risk from condensate trays.
VERIFIED TARGETQuieter fan operation.
VERIFIED TARGETMore accurate response to temperature demand.
VERIFIED TARGET
Inspect fcu.
Clean air. Controlled temperature. Balanced systems. Verified performance.