A/C Services & Installation & Maintenance
AHU
Air Handling Unit inspection, maintenance, coil cleaning, filter renewal and airflow verification.
AFAQ AL-MARIFA • UAE SCROLL TO EXPLORE
SYSTEM SYMPTOMS
What the Property Shows
Inspection follows the complete system path before any work is proposed.
High pressure drop across filters or coils.
Belt, bearing or blower noise.
Poor cooling after the AHU stage.
SYSTEM LOGIC
Inside the System
AHUs are main air-moving assemblies that filter, cool and distribute air through large duct networks.
Request an inspection ↗ WORK SEQUENCE
Inspection Sequence
01
Site Survey
Inspect the AHU layout, equipment access, power, drainage, airflow path and operating condition.
02
Technical Scope
Define the correct installation, cleaning or maintenance method for the AHU before execution begins.
03
Execution
Carry out the approved work with property protection, calibrated tools and clean mechanical workmanship.
04
Testing & Handover
Verify airflow, temperature, pressure, noise and safe operation after the AHU work is complete.
EXPECTED OUTCOMES
Target Performance
01
Restored design airflow.
VERIFIED TARGET 02
Cleaner coil and filter banks.
VERIFIED TARGET 03
Quieter mechanical operation.
VERIFIED TARGET 04
Improved chilled-water heat exchange.
VERIFIED TARGET
07 • SYSTEM OUTCOME
Inspect ahu.
Clean air. Controlled temperature. Balanced systems. Verified performance.